• <tr id="kr61e"></tr>
    
    
    <button id="kr61e"></button>
    <thead id="kr61e"><b id="kr61e"><em id="kr61e"></em></b></thead>
    1. 手机在线一区二区三区,国产精品无码无卡A级毛片,亚洲AVAV天堂Av在线精品一区二区 ,精品国产Ⅴ无码大片在线观看,欧AV美亚洲精品无码专区,国产一级淫片a免费播放口,亚洲 国产 制服 丝袜 一区,成熟女人特级毛片www免费

      News INFORMATION


      Ruling machine work error cleaning of several skills


      Release time:2019/3/6 15:27:29 Source:m.eddcn.com/

      Abstract:Ruling machine work, a lot of have no contact with hot melt marking machine marking construction cli

      Ruling machine work, a lot of have no contact with hot melt marking machine marking construction clients often have such misunderstanding, think hot melt marking and room temperature cold spray, as long as there is a hot melt marking machine can the construction. However, the reality is hot melt marking construction is much more complicated than the normal temperature line construction.

      Surface cleaning: specialized personnel arrangements for road surface cleaning, guarantee the road dry clean, no dust. Measuring lofting: under the condition of the road clean, dot carried out in accordance with the design drawing, and then choose white latex material road edge line line, check and correct lines of the reentry after delimit work. Lines delimit:

      a: Add the hot melt coating into the hot melt kettle and heat it evenly to the appropriate temperature
       
      b: On one side of the laid waterline, the special primer for road shall be uniformly applied to make the road surface and the marking better stick together, and the evaporation of underground water shall be isolated to prevent the marking from falling off after construction.
       
      c: The hot melt coating melted to the construction state shall be loaded into the push type construction vehicle, and an appropriate amount of glass beads shall be put into the vehicle body.
       
      d: Regulate the flow, and conduct formal construction when the bottom oil is dried to a proper degree. The construction shall be based on the waterline to ensure the construction quality.
       
      e: The coating thickness of lane edge line, lane boundary line, guide arrow, road centerline, warning markings, etc. is 1.5-2.0mm, and the thickness of deceleration markings is 5mm. The glass beads on the surface shall be evenly distributed, and the marked lines shall have good visibility, consistent width, equal spacing, even edges, good reflective effect, and firm connection with the road surface.
       
      Construction skills of hot melt marking with marking machine
       
      As the hot melt marking construction of the marking machine, the powder hot melt marking coating needs to be heated to a high temperature of 180-200 degrees Celsius and melted into liquid before use. For the sake of construction safety, small hot melt marking machines will separate the marking device and the heating equipment for heating and melting paint, which can avoid unnecessary burns and greatly improve the efficiency of melting materials. Generally, the hot melt marking equipment required by the preliminary marking construction team includes: hydraulic double cylinder hot melt kettle, hand push hot melt marking machine, hand push hot melt zebra crossing machine, hand push pre marking machine, etc.
       
      Cleaning: During the construction, the construction line shall be marked while cleaning to ensure that there is no throwing, sprinkling, dripping, leakage and pollution, and the equipment is free of oil and water leakage. The construction team shall clean the road surface in the area at a certain distance from the marking line in time to keep the road surface clean and tidy without pollution and damage. Among them, the LXD1200 oil and gas dual cylinder hot melt kettle is recommended to use a hydraulic dual cylinder hot melt kettle. This type of hot melt kettle adopts vehicle design, which is greatly convenient for transportation. At the same time, it has the characteristics of high melting material efficiency, good melting material quality, less fuel use, energy conservation and environmental protection, simple operation, high safety, etc. It is very efficient to cooperate with the manual marking machine for the construction of yellow and white hot melt flat long solid marking lines and short virtual marking lines.
       
      The marking materials of Guruike series marking machine shall comply with the provisions of Pavement Marking Paint (JT/T280-2004).
       
      (2) The pavement shall be carefully cleaned before the construction of pavement markings. The pavement surface shall be dry and free of dust.
       
      (3) The pavement polluted by marking construction shall be cleaned in time to ensure that the pavement is clean.
       
      (4) The alignment of the marking line shall be smooth, consistent with the road shape, and the curve shall be smooth. No broken line is allowed.
       
      (5) The reflective marking glass beads shall be evenly distributed, firmly attached and evenly reflected.
       
      (6) The thickness of the marking line shall be constructed in full accordance with the requirements, and the service time limit shall be ensured.
       
      (1) To ensure the quality of the project construction process, carefully review the construction drawings before commencement, prepare the construction organization design according to the actual situation, and after approval, strictly follow the construction organization design.
       
      (2) The quality of engineering materials shall be guaranteed. Establish strict material receiving and releasing system. No unqualified materials shall be allowed to enter the site for construction.
       
      (3) , control quality from the management system
       
      a: All construction personnel shall conduct self inspection.
       
      b: The quality inspection shall be conducted once every certain distance of the construction, and the construction supervisor shall personally supervise
       
      c: The technical disclosure system shall be implemented, and the technical disclosure must be carried out before the commencement of construction

      Please indicate the source of the reprint:http://m.eddcn.com//en/news/3639.html。

      Contact us

      Get in touch with us. Please use the following contact at will.

      Enter Your name
      Please enter your mailbox account
      Fill out your message here
      Send success
      I'm sorry, your sending is wrong.

      Address:Shangdang town of Dantu District,Zhenjiang City,Jiangsu Province,China Telephone:+86 13852907688  fuhao@zjslxd.com m.eddcn.com/
      主站蜘蛛池模板: 大陆熟妇丰满多毛xxxx| 99精品国产99久久久久久51| 克山县| 97色成人综合网站| 中文字幕亚洲中文字幕无码码| av区无码字幕中文一区| 理论片在线电影大全免费观看| 漂亮人妻洗澡被公强BD| 无码成A毛片免费| 亚洲中文字幕无码AV永久| 久久不见久久见免费视频7| 国产一卡2卡三卡4卡麻豆| 欧美激情一区二区三区aa片| 欧美熟妇另类久久久久久多毛| 天国少女精彩片段| 国产成人一区二区不卡| 县级市| 亚洲av成人午夜福利| 麻豆国产96在线日韩麻豆| 人妻在线无码一区二区三区| 色视频一区二区| 国偷自产视频一区二区久| 亚洲中文字无码av| 久久国产欧美一区二区免费看| 国产精品va在线播放我和闺蜜| 亚洲AV无码成人网站在线观看| 国产精品亚洲二区在线播放| 最新女人另类zooz0| 亚洲国产韩国视频在线观看| 日韩欧美一本书道一区二区| 最新毛片婷婷99精品视频| A级毛片无码国产| 久久午夜视频| 2020人妻中文字字幕在线乱码| 中文字幕乱码2国语自产| 国产精品亚洲А∨天堂2021| 人妻春色欧美另类综合| 亚洲精品无码久久毛片波多野吉衣 | 亚洲精品国产综合一线久久| 97SE亚洲国产综合自在线| 久章草综合精品视频毛片|