• <tr id="kr61e"></tr>
    
    
    <button id="kr61e"></button>
    <thead id="kr61e"><b id="kr61e"><em id="kr61e"></em></b></thead>
    1. 手机在线一区二区三区,国产精品无码无卡A级毛片,亚洲AVAV天堂Av在线精品一区二区 ,精品国产Ⅴ无码大片在线观看,欧AV美亚洲精品无码专区,国产一级淫片a免费播放口,亚洲 国产 制服 丝袜 一区,成熟女人特级毛片www免费

      News INFORMATION


      The construction method of marking can be divided into several categories


      Release time:2019/6/26 11:48:20 Source:m.eddcn.com/

      Abstract:Hand push the line width of ruling machine has the width of the hopper, commonly used 100 mm, 150 mm, 200 mm. Hot melt coating to be heated to 180-230 degrees Celsius to construction

      The construction method of lines from the result of wire drawing machine can be roughly divided into artificial marking method and mechanical construction method. Type artificial line is one of the hot melt marking the construction of the main and the most commonly used one kind of construction method. Hand push the line width of ruling machine has the width of the hopper, commonly used 100 mm, 150 mm, 200 mm. Hot melt coating to be heated to 180-230 degrees Celsius to construction, the working principle of hand push type line is the use of coating type construction, the construction, the solid cover coating into the hot kettle, melt after the flow state, put this push marker of insulation materials in the barrel. Line, introducing the molten coating line in the bucket, crossed the bucket directly on the road, because there is a certain gap between lines are linked to the ground, when push the marking machine, scrape on automatic flow and a straight line. In blow out of the line at the same time, the function of line synchronization in line evenly on the surface and a layer of reflective glass beads.

       
      1. The hand push type hot melt marking machine advantage construction with less equipment, long life, can be used for 3 to 5 years. Do marking reflective effect is better, the anti-pollution ability is strong, can keep for a long time and bright, has the good adhesion, excellent wear resistance and durability. Hot melt coating construction to prepare ahead of time, such as warning signs warning column, auxiliary tools, construction, as well as the necessary drawing board, fonts, etc. Clean the road: first of all on the road foundation treatment, was carried out on the road debris removal. If the road is difficult to use conventional methods to remove debris, steel brush is used road cleaner to be hard to remove, net road with wind blowing off the road debris, eventually reach the standard to meet the requirements of marking surface cleaning.
       
      2. Construction lofting: within the scope of the construction period, according to the construction drawings and technical requirements, measuring unreeling, so that the working standard control. After finishing the lofting, carries on the test. Early detection qualified, then please confirm to the supervision engineer. Qualified rear can be carried out under the procedure. Road marking construction precautions: construction, use high-pressure wind road net machine first road TuSha sundry blowing off, make sure the road without loose particles, dust, asphalt, oil and other impurities affecting the quality of marking and dry.
       
      3. Then according to the requirements of engineering design in the proposed construction sections using the artificial operation of the automatic feeding machine and auxiliary to pay-off, after required by coated under high-pressure airless spraying machine spraying and the type and dosage of supervision engineer for approval under the same paint (primer), besmear next machine after fully dry box self-propelled hot melt marking machine or walking type hot melt marking machine marking.
       

      Please indicate the source of the reprint:http://m.eddcn.com//en/news/3647.html。

      Contact us

      Get in touch with us. Please use the following contact at will.

      Enter Your name
      Please enter your mailbox account
      Fill out your message here
      Send success
      I'm sorry, your sending is wrong.

      Address:Shangdang town of Dantu District,Zhenjiang City,Jiangsu Province,China Telephone:+86 13852907688  fuhao@zjslxd.com m.eddcn.com/
      主站蜘蛛池模板: 一二三四在线观看免费高清中文在线观看| 国产少妇出轨国语对白| 正在播放国产一级视频| 欧美在线视频一区二区三不卡| 欧美成人精品视频一区二区三区| 狠狠躁天天躁中文字幕av| 99精品国产在热2019国产| 久久亚洲精品无码AV丝瓜 | 天天躁夜夜躁人人爽| 久久成人国产精品免费| 欧美日韩在线观看播放一区| 亚洲成av人片不卡无码手机版 | 久久久SS麻豆欧美国产日韩| 妓女妓女影院妓女视频妓女影库| 亚洲av美国av产亚洲av图片| 久久午夜无码鲁丝片秋霞| 国产午夜精品福利视频| 日产中文字乱码卡一卡二| 国产成人久久综合第一区| 霞浦县| 欧美狠狠入鲁的视频777| AV在线不卡观看免费观看| 国产精品久久久久9999高清 | 狠狠色综合久久丁香婷婷| 乌拉特后旗| 18禁黄网站禁片免费观看天堂 | chinese极品中国 videos| gogo专业大尺度亚洲高清人体| 亚洲成a人片在线观| 尤物在线精品一区| igao视频天堂| 亚洲vav在线男人的天堂| 欧美精品久久久久久久自慰| 国内精品自线在拍| 宜阳县| 亚洲精品5555在线| igao在线播放 国产精品| 688欧美人禽杂交狂配| 欧美性色欧美精品视频69 | 极品国产高颜值露脸在线| 亚洲人成色7777在线观看不卡|